OTTOMMO INTERNATIONAL CO., LIMITED
|
Gold Index: 13122
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Engine connecting part
Automobile carbon steel investment casting parts with heat treatment
Description
This part is for automobile, we use way of investment casting to produce, whose lead time will be 20-25 working days after PO.
Item | Description |
Product Name | Engine connecting part |
Working Process | Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging |
Material | 8620 carbon steel |
Surface Treatment | According to the requirement of customer |
Application(Products cope) | automobile |
Quality Control | ISO9001, TS16949 |
Thickness | Only to raw casting, more than 4mm |
File Format | Solidworks,Pro/Engineer,Auto CAD,PDF,JPG |
Service | 24-hour reply to customer's enquiry |
Inspection | IQC, IPQC,FQC,QA |
Mould | Depend on customer's require to make the mould. |
Sample confirmation | Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied. |
Packing | Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements |
Payment & Shipping Terms:
Minimum Order Quantity: | 5000 |
Price: | Quoted per see the drawing or sample |
Delivery Time: | 20-25 working days after received PO |
Payment Terms: | T/T, L/C |
Supply Ability: | 50,000pcs per month |
FAQ:
Q: Who Are We?
A: 1.We are a factory do the casting for more than 10 years.
2.Aroud more than 200 workers and 3000 square meter workshop
3.Customizing services, OEM services and good after services, etc.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in ningbo city, zhejiang Province, China, near Shang hai. You can fly to Shanghai Pudong airport directly.
Q: What is the payment?
We prefer T/T, and also L/C if you want, the way of payment we can discuss.
Q: What is the lead time?
1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.
2. If do the mass production, the lead time will be with 20 working days after receiving the PO.
GOOD SERVICE:
We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.
LOWER PRICE:
The price of our products is reasonable and competitive, and we can discuss if you want.
Why should you choose us?
OTTOMMO INTERNATIONAL CO., LIMITED [China (Mainland)]
Business Type:Manufacturer
City: Ningbo
Province/State: Zhejiang
Country/Region: China (Mainland)