Post Offer Free
OTTOMMO INTERNATIONAL CO., LIMITED  

Gold Index: 13122

You are here: home  > No welding soluble wax investment casting stainless steel tube

No welding soluble wax investment casting stainless steel tube 

Place of Origin: Zhejiang, China (Mainland) 
inquire
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: Ottommo-soluble wax-001

CF8M tube soluble wax investment casting<b

CF8M tube soluble wax investment casting
 
Description
Why should use soluble wax way on the casting? If the inner structure is too hard to use one tooling to produce, we have to use soluble wax way. We will do two toolings, one tooling for the soluble wax, and the other tooling for the whole casting. Firstly, we will get the soluble wax mould from the sioluble wax tooling, and then put this mould on the other tooling for the whole casting, later get the whole mould. And at last, put the whole wax mould into water, waiting for the soluble wax mould disappeared, we get the wax mould of the whole casting for the next procedures.
 

ItemDescription
Product NameCF8M tube soluble wax investment casting
Working ProcessTooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging
MaterialStainless steel 316
Surface TreatmentAccording to the requirement of customer
Application(Products cope)air pressing machine, for the tube joint
Quality ControlISO9001, TS16949
ThicknessOnly to raw casting, more than 4mm
File FormatSolidworks,Pro/Engineer,Auto CAD,PDF,JPG
Service24-hour reply to customer's enquiry
InspectionIQC, IPQC,FQC,QA
MouldDepend on customer's require to make the mould.
Sample confirmationBefore start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied.
PackingInner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements

 
Payment & Shipping Terms:

Minimum Order Quantity:500
Price:Quoted per see the drawing or sample
Delivery Time:20-25 working days after received PO
Payment Terms:T/T, L/C
Supply Ability:10,000pcs per month

 
FAQ:
 
Q: What is the lead time?
1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.
2. If do the mass production, the lead time will be 20-25 working days after receiving the PO.
 
GOOD SERVICE:
We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.
 
LOWER PRICE:
The price of our products is reasonable and competitive, and we can discuss if you want.
 
PERFECT QUALITY:
We have strict quality control from producing to delivery. Our company had strong technology support. We have cultivated a group of managers who are familiar with product quality , good at modern concept of management .
 
Strict inspection we do during operation
1. We have specialized QC testers to check the products quality according to different customers.
2. We have IQC to check the dimensions and surface of the incoming material.
3. We have PQC to inspect full-course during the processing
4. We have FQC to inspect all the plating products from outsides and make the 100% inspection before the shipments
5. We are willing to provide with sample for

bigPhoto
 Mr. Mr. Wang

Tel: 86-574-63751095
Contact to this supplier

Related Search

Find more related products in following catalogs on Hisupplier.com

Company Info

OTTOMMO INTERNATIONAL CO., LIMITED [China (Mainland)]


Business Type:Manufacturer
City: Ningbo
Province/State: Zhejiang
Country/Region: China (Mainland)

You May Like:

Product (289)